✅ Case Study: Successful Soft Strip Out & Site Clearance – Industrial Unit, Manchester

Client: Redstone Developments Ltd
Location: Trafford Park, Manchester
Sector: Industrial / Commercial
Services Delivered: Soft Strip Out, Asbestos Removal, Site Clearance
Duration: 3 weeks
Completion: On Time & Within Budget
Project Value: £42,000


🧱 Project Overview

In early 2025, W & S Hire Ltd was contracted by Redstone Developments Ltd, a leading commercial property developer, to carry out a full soft strip out, asbestos removal, and site clearance of a large vacant industrial unit in Trafford Park, Manchester. The property was being prepared for a complete refurbishment and repurposing into modern workspace and storage facilities.

The unit, measuring just over 3,500 square metres, had previously been used for manufacturing and warehousing, and still contained outdated M&E systems, mezzanine floors, office partitions, kitchen areas, and contaminated materials.


🔍 Scope of Works

Our team was responsible for:

  • Full soft strip out of non-structural elements (partitions, suspended ceilings, floor finishes, fixtures)
  • Removal and safe disposal of redundant HVAC, pipework, ducting, and electrical systems
  • Asbestos removal (confirmed via R&D survey prior to strip out)
  • Disconnection and isolation of live services
  • Internal waste segregation and sustainable disposal
  • Full site clearance including removal of outdoor waste, shrubbery, and disused structures

⚠️ Challenges Faced

This wasn’t just a simple rip-out. The project came with several challenges:

  1. Asbestos Risk:
    During the initial survey, chrysotile (white asbestos) was identified in floor tiles and pipe lagging within the plant room.
    ➤ We immediately arranged for a licensed asbestos removal team to isolate and safely remove the hazardous materials, in line with HSE guidelines (CAR 2012).
  2. Tight Turnaround:
    The client had a strict 3-week window before the incoming construction team was due on-site.
    ➤ We created a phased work plan with additional operatives and extended working hours, including weekends, to stay on target.
  3. Live Environment Adjacent:
    A functioning business shared a boundary wall, meaning noise and dust levels had to be strictly managed.
    ➤ We implemented dust suppression, noise-reducing equipment, and worked in split zones to prevent disruption.

🛠️ How We Delivered

We mobilised our soft strip and clearance crew within 48 hours of instruction and quickly set up a safe, compliant work zone. Over the course of three intensive weeks, the following was achieved:

  • All asbestos was removed and cleared in the first 5 days with air clearance certification issued on schedule
  • Internal strip out completed on time, including manual dismantling of mezzanine structures and plant room decommissioning
  • Over 94% of waste diverted from landfill, with segregated skips for metal, plasterboard, wood, and mixed materials
  • Outdoor areas fully cleared of fly-tipped waste, vegetation, and broken concrete bases
  • Site handed back clean, safe, and ready for refurbishment

We worked closely with Redstone’s project manager, keeping communication open throughout. Daily check-ins ensured full alignment with the construction schedule and no surprises on budget.


📸 Results

✅ Project Completed On Time
✅ Delivered Within Budget
✅ Zero Accidents or Incidents
✅ Full Compliance with HSE & Environmental Regulations
✅ Over 25 tonnes of materials recycled or reused
✅ Positive feedback from the client, neighbouring businesses, and site managers


🗣️ Client Feedback

“W & S Hire Ltd were professional, proactive and a pleasure to work with. Despite a tight timeframe and some asbestos complications, they delivered without a hitch. Their attention to detail and commitment to safety really stood out. We’ll definitely use them again for future strip out and site prep projects.”

Chris Holland, Senior Project Manager, Redstone Developments Ltd


🤝 Need a Trusted Partner for Strip Out or Site Clearance?

Whether you’re dealing with old offices, retail units, industrial plants or full-scale redevelopments, W & S Hire Ltd delivers efficient, compliant, and cost-effective solutions across the UK.

📞 Call us today for a free, no-obligation quote
📍 Nationwide Service | 16+ Years Experience | Rapid Mobilisation

W & S Hire Ltd – Clearing the way for construction with confidence.

Related Posts

Understanding Soft Demolition: Expert Soft Demolition Contractors & Services

When planning to refurbish, reconfigure, or repurpose a building, many clients seek a method that allows internal changes without full…

Soft Strip Specialists Not Just Contractors Nottingham | Preparing Interiors with Expert Precision

Soft strip interior demolition in Nottingham demands a unique blend of technical skill, local knowledge, and conscientious service delivery. In…

🏢 Specialists In All Sector-Specific Strip-Outs

Soft strip demolition is a critical phase in many construction and refurbishment projects, especially when it comes to preparing buildings…

♻️ Responsible Waste Management in Soft Strip Demolition: How Professionals Handle Waste the Right Way

In modern construction and demolition projects, waste management is no longer just a side task. It is a critical part…

💡 The Importance of Mechanical & Electrical Disconnection in Soft Strip Demolition Projects

In any soft strip demolition project, one of the most crucial and often underestimated tasks is the careful disconnection and…

Non Structural Demolition

Non-Structural Demolition Services UK – Experts in Internal Strip Outs at SoftStripContractors.co.uk At SoftStripContractors.co.uk, we specialise in non-structural demolition services…

Hard Demolition Services

Hard Demolition Services – W & S Hire Ltd At W & S Hire Ltd, we specialise in hard demolition…

🧱 Comprehensive Guide to Non-Structural Interior Removal in Soft Strip Demolition

Non-structural interior removal is a vital phase in soft strip demolition, designed to clear out all internal elements that do…

🏗️ Case Study: Complete Soft Strip-Out & Interior Demolition of Multi-Storey Office Block in Birmingham City Centre

Client: Hawkstone DevelopmentsLocation: Birmingham, West MidlandsSector: Commercial / Office RefurbishmentDuration: 6 WeeksScope of Work: Full internal soft strip, waste removal,…